Heat & Glo • XLR-N-CE, XLR-PB-CE • 2198-900 Rev. L • 3/13

D. Disassemble Vent Sections

• Rotate either section (see Figure 10.7) so the seams on

both pipe sections are aligned as shown in Figure 10.8.

• Pull carefully to separate the pieces of pipe.

Figure 10.8 Align and Disassemble Vent Sections

Figure 10.7 Rotate Seams for Disassembly

E. Install Decorative Ceiling Components

A decorative ceiling thimble can be installed on a flat ceil-

ing through which the vent passes. The decorative ceiling

thimble is used to cover the firestop.
• Seal the gap between the vent pipe and firestop using

high temperature (150 ºC minimum continuous exposure

rating) silicone to prevent cold air infiltration.

• Install the decorative ceiling thimble by sliding it up to

the ceiling and attaching it using the provided screws.

A decorative cathedral ceiling support box can be installed

on a cathedral ceiling through which the vent passes.
• Use a plumb-bob to mark the center line of the venting

system on the ceiling and drill a small hole through the

ceiling and roof at this point. Locate the hole and mark

the outline of the cathedral ceiling support box on the

outside roof.

• Remove shingles or other roof covering as necessary to

cut the rectangular hole for the support box. Cut the hole

3 mm larger than the support box outline.

• Lower the support box through the hole in the roof until its

LEVEL

CATHEDRAL CEILING

SUPPORT BOX

5,1 cm MIN. BELOW

FINISHED CEILING

CUT HOLE 3 mm GREATER

IN SIZE THAN PATTERN OF

SUPPORT BOX AS IT IS

PROJECTED ONTO ROOF

LINE

Figure 10.9

Figure 10.10

bottom is at least 5,1 cm below the ceiling (Figure 10.9).

• Level the support box both vertically and horizontally and

temporarily tack it in place through the inside walls into

the roof sheathing.

• Use tin snips to cut the support box from the top corners

down to the roof line and fold the resulting flaps to the

roof. See Figure 10.10.

• Nail the flaps to the roof AFTER running a bead of non

hardening sealant between the flaps and the roof.

WARNING! Risk of Fire! Clean out ALL materials from

inside the support box and complete the vertical vent run

and termination.