K. install horizontal termination cap – Heat & Glo Fireplace XLR-N-CE User Manual

Page 40

Advertising
background image

Heat & Glo • XLR-N-CE, XLR-PB-CE • 2198-900 Rev. L • 3/13

40

Figure 10.17 Venting through the wall

K. Install Horizontal Termination Cap

WARNING! Risk of Fire! The telescoping flue section

of the termination cap MUST be used when connecting

vent.

• 3,8 cm minimum overlap of flue telescoping section

is required.

Failure to maintain overlap may cause overheating and

fire.

• Vent termination must not be recessed in the wall. Siding

may be brought to the edge of the cap base.

• Flash and seal as appropriate for siding material at

outside edges of cap.

• When installing a horizontal termination cap, follow the

cap location guidelines as prescribed by current local or

national codes and refer to Section 6 of this manual.

CAUTION! Risk of Burns! Local codes may require in-

stallation of a cap shield to prevent anything or anyone

from touching the hot cap.

Note: When using termination caps with factory-supplied heat

shield attached, no additional wall shield firestop is required on

the exterior side of a combustible wall.

INTERIOR

HEAT SHIELD OR

EXTENDED

HEAT SHIELD

WALL SHIELD

FIRESTOP

HEAT SHIELD

3,8 CM MIN.

OVERLAP

SHEATHING

SLIP SECTION

CAN BE EXTENDED

INNER VENT

OUTER VENT

EXTERIOR

Advertising
This manual is related to the following products: