Front side, Openings for input and output cable connections – GE 225 User Manual

Page 13

Advertising
background image

g

GE

OPM_SGS_ISG_M22_M30_0US_V011.doc

13/38 Installation

Guide

SG Series 225 & 300 kVA

Openings for input and output cable connections

SG

S_2

25-

300

_UP

S v

iew

top

_01

US

1,650mm

64.96"

160mm

6.30"

2.7

6"

40mm

1.58"

70m

m

31.

50"

21.

66"

550

mm

800

mm

Utility input
Output Load

Battery

Fig. 3.4.1-2 Opening on top of the cabinet for input and output cables

Utility input
Output Load

6.30"

160mm

1.77"

550

mm

21.

66"

800

mm

31.

50"

100

mm

3.9

4"

1,650mm

64.96"

SG

S_2

25-

300

_UP

S v

iew

bo

ttom

_02

US

45mm

Fig. 3.4.1-3 Opening on the bottom of the cabinet for input and output cables

SG Series openings are
provided on the top and
the bottom of the UPS
for the connection of
input and output cables.

Pay attention to the
position of these
openings, when
choosing the placement
of the UPS.
These openings are
covered with a
protective plate.


Fixing of the UPS cabinet on the floor

The UPS cabinet is free standing and normally does not require to be bolted to the floor.
The UPS cabinet can be fixed however to the floor by bolting it with the supporting blocks to the
floor.

See Fig. 3.4.1-4.

62.205"

1580mm

35mm

71

3m

m

28

.0

71

"

60

m

m

2

.363

"

60mm

2.363"

68

0m

m

26.772"

1.378"

1.378"
35mm

=

=

SGS_225-300_UPS view bottom_02US

Ш 0.47305"
Ш 12mm

Front side

Fig. 3.4.1-4 Fixing of the UPS cabinet on the floor

Advertising
This manual is related to the following products:

300