GE 225 User Manual

Page 15

Advertising
background image

g

GE

OPM_SGS_ISG_M22_M30_0US_V011.doc

15/38 Installation

Guide

SG Series 225 & 300 kVA

3.5 VENTILATION AND COOLING

Fig. 3.5-1 Installation on plain floor

Fig. 3.5-2 Installation on raised floor


The heat produced by the UPS is transferred to the environment by its ventilation.

Air inlets for UPS ventilation are located on the front of the UPS, while air outlets are on top
of the cabinet.

A suitable ventilation or cooling system must be installed to extract the heat from the UPS
room.


Do not put anything on the top of the cabinet.




Air filtration systems could be required when the UPS operates in a dirty environment.
Contact your Dealer or the nearest Service Center for appropriate solutions.

In order to prevent overheating of the UPS, the available air intake flow rate must exceed the
total air exhaust flow rate requirement of the UPS system.

The below table indicates the heat dissipation at full Load at PF = 0.8 lag. and charged
Battery, up to 3,280 ft (1,000 m) altitude, for cooling air 77°F (25°C) to 86°F (30°C).

Losses

Cooling air flow

UPS rating

BTU / hr

kW

CFM

m

3

/ h

SG Series 225 kVA

50,512 14.80 2,541 4,317

SG Series 300 kVA

64,164 18.80 3,228 5,484

Advertising
This manual is related to the following products:

300