Installation

Guide

SG Series 225 & 300 kVA

This UPS is only designed to operate in a wye-configured electrical system
with a solidly grounded neutral.

In case of 3-wire utility input the following solutions are possible:
1- Connection

of a

“3-wire kit” between Utility Input and Neutral of the

output transformer.
Attention: With

this

configuration, load can only be connected phase-

phase. Absolutely no load connection permitted to the
Neutral of the output transformer.

In a RPA configuration with 3-wire
kit, it’s most important to connect
the Neutrals of the UPS outputs
together (see Fig .3.8.3-2
).

Cable section for this connection
shall be not less then AWG 1
.

Fig. 3.8.3-2 3-wire kit for RPA Parallel System


2- Bypass

transformer.

In this case the Neutral of wye secondary winding must be connected
to the Neutral
of the output transformer.

Contact your Service Centre, which will help you to find valuable solutions.

Notices for installation

Q2

Q1

Q2

4

3

2

1

2

3
4

1

S

G

S

_225-300_UP

S

B

R

1-

2-3

_0

1

BR1

BR3

BR2

Fig. 3.8.3-3 AC bus bars BR1, BR2 and BR3

For separate Bypass and Rectifier input configuration AC bus bars BR1, BR2 and BR3 must
be removed
.