GE 225 User Manual

Page 16

Advertising
background image

g

GE

OPM_SGS_ISG_M22_M30_0US_V011.doc

16/38 Installation

Guide

SG Series 225 & 300 kVA

3.6 UNPACKING

The UPS and Battery Cabinets may be shipped packaged in carton boxes or in wooden
crates (if requested).

Move the cabinets as close as possible to the final location before removing from the pallet.

If delivered in a wooden crate, remove the cabinet from the pallet with care, because of the
heavy weight of the equipment.

Take care not to damage the UPS when moving by forklift.


For parallel systems, the delivery also includes the bus control
cables for inter-connecting the UPS modules.


Packing material recycling
GE Industrial Systems, in compliance with environment protection, uses
only environmentally friendly material.
UPS packing materials must be recycled in compliance with all applicable
regulations.

Advertising
This manual is related to the following products:

300