Dc e – GE 225 User Manual

Page 22

Advertising
background image

g

GE

OPM_SGS_ISG_M22_M30_0US_V011.doc

22/38 Installation

Guide

SG Series 225 & 300 kVA

CAUTION !
Panel “E” should never be removed or replaced with power applied to the UPS.
This panel is in close proximity to 480V live buss bars.
Always disconnect the rectifier, bypass, load and battery sources from the
UPS before removing or replacing this panel.
If not serious injury or death could occur!

How to access the compression lugs for the cable connections.

S

G

S_

22

5-

30

0_

UP

S c

o

nne

ct

ion_01US

Q2

Q1

2

4

3

1

1

2

3

4

D

C

E

Bottom

Top entry cables

A

B

entry cables

F

Fig. 3.8.1-1 Access to the input / output connections

To access input, output and Battery Connections proceed as follows:

Unscrew bolts “B” to open the electronics “A”.

Remove protection panel “C”.

Remove protection panel “D”.

Remove protection panel “E”.

Remove UPS side panel “F”.

Advertising
This manual is related to the following products:

300