GE 225 User Manual

Page 24

Advertising
background image

g

GE

OPM_SGS_ISG_M22_M30_0US_V011.doc

24/38

Installation

Guide

SG Series 225 & 300 kVA

This UPS is only designed to operate in a wye-configured electrical
system with a solidly grounded neutral.


In case of 3-wire utility input the following solutions are possible:

1- Connection of a “3-wire kit” between Utility Input and Neutral of the

output transformer.

Attention: With this configuration, load can only be connected

phase-phase.
Absolutely no load connection permitted to the Neutral of
the output transformer.


In a RPA configuration with 3-wire
kit, it’s most important to connect
the Neutrals of the UPS outputs
together (see Fig .3.8.2-2
).

Cable section for this connection
shall be not less then AWG 1
.

Fig. 3.8.2-2 3-wire kit for RPA Parallel System



2- Bypass

transformer.

In this case the Neutral of wye secondary winding must be connected
to the Neutral
of the output transformer.

Contact your Service Centre, which will help you to find valuable solutions.

Advertising
This manual is related to the following products:

300