Ups 1 ups 2, Control bus cables routing – GE 225 User Manual

Page 33

Advertising
background image

g

GE

OPM_SGS_ISG_M22_M30_0US_V011.doc

33/38

Installation

Guide

SG Series 225 & 300 kVA

SG

S_225

-300_

R

PA c

o

nt

ro

l bu

s c

a

bl

e_

0

2U

S

Q1

Q2

2

4

3

1

3
4

2

1

JA1

1

3
4

2

4

2
3

1

Q1

Q2

JB1

UPS 1

UPS 2

JA2

JB2

unit 3, 4, 5,

Next parallel

6, 7, 8

JB1

JA1

JA

JB

JA

JA2

JA1

JB1

JB2

JB

Fig. 3.11-3 Control Bus cable routing and connection


Control bus cables routing

Place and fix the cables JA-1/2/3/4/5/6/7 and JB-1/2/3/4/5/6/7 inside the UPS cabinets in the
position illustrated in the drawing.


Pay attention when cabling and routing the bus cables JA and JB inside the
UPS cabinet.
In case one unit should be removed from the parallel system, the bus cables
JA
and JB must be removed from the cabinet without disconnecting them
from the metal plate where the sockets JA
and JB are located.


For reliability reasons the cables JA-1/2/3/4/5/6/7 and JB-1/2/3/4/5/6/7 connecting the units
should be run in separated protected conduits (as indicated in fig. 3.11-3) separated from the
power cables.

It is important that the cable JA must be the same length as cable JB.

The connection of the control bus cable in a UPS system already powered
requires a special reset operation, which can be made by only a trained
operator.