J-400 series, Page 10, Figure b control box – Jacuzzi J - 480 User Manual

Page 14

Advertising
background image

Page 10

J-400 Series

8. Connect wires, color to color, on terminal blocks TB1 and TB3 (Figure C-D,

page

11

). TIGHTEN SECURELY! All wires must be hooked up securely or

damage could result.

9. Install control box door and reinstall the cabinet side panels.

Figure A

Equipment Area

10

4

2

2

Flow

Note: Pump Locations Vary by Model

5

6

6

9

8

7

6

3

1

11

1. Control Box
2. Power Supply Entrance(s)
3. Jet Pump #1
4. Heater
5. Spa Drain Valve
6. Pump Drain Plugs(s)

7. Jets Pump #2
8. Filter/Circulation Pump
9. Optional CD Ozonator (Purchase

Separately)

10. Factory Installed Ozone Injector
11. Control Panel

Figure B

Control Box

TB1

3

2

1

1. Terminal Block
2. Bonding Lug
3. Grounding Terminal

Advertising
This manual is related to the following products: