INSTALL CEMENT BOARD

Install cement board to the walls according to

established installation methods. The cement

board must cover the entire wall surface from

ceiling to subfloor. Provide a cutĆout area around

the mounting frame.
Mark the cement board for the suction fitting hole

by first measuring up at least 2Ć1/2Ćinches from

the footbath basin material. Add the thickness of

the finished floor material you plan to use, and

draw a pencil mark at that location. Make sure the

wall is perfectly flat and smooth within a 5Ćinch

diameter area around the suction hole pencil

mark. Use a hole saw to drill a 3Ć1/4Ćinch hole in

the cement board at the pencil mark.
Carefully cut holes for the water supplies, suction,

drain and drain overflow, as well as any lighting

fixtures or other required accessories.
Cut a hole around the keypad outlet box, if used. If

you are not using the outlet box, cut or drill a

1Ć1/8Ćinch diameter hole for the cable.

CONSTRUCT FOOTBATH BASIN

Construct the footbath basin according to your

specific BodySpa room design. Employ established

shower basin fabrication materials and techniques.

Provide a 1/4 to 1/2Ćinch per foot pitch to the

footbath basin floor for the correct floor drainage.
Locate and cut the drain and drain overflow holes

according to the instructions packed with the drain.

The KĆ7179 Drain has been specially designed for the

Custom BodySpa, and is recommended for use with

this installation. The installation instructions

included with the KĆ7179 Drain provide detailed

instructions for this installation. Install the drain

flange according to the drain instructions.

INSTALL WATERĆRESISTANT WALL

MATERIAL

Install waterĆresistant wall material to the entire

ceiling surface according to established methods.

Check Point #7

-

Waterproofing membrane or compound installed.

-

Suction bushing installed.

-

Cement board installed to subfloor and walls.

-

Required holes marked and cut in cement board.

-

Confirm footbath basin floor pitch of 1/4 to 1/2Ćinch per foot.