Inst alla tion inst alla tion inst alla tion – Kohler custom Bodyspa 116347-2 User Manual

Page 23

Advertising
background image

116347Ć2Ć

AA

(A)

24

Kohler Co., Kohler, WI

WATER TEST THE SYSTEM

Allow the silicone sealant and any finished wall

materials or grout to fully cure before proceeding.

Follow all manufacturer's recommendations

regarding water exposure to their products as well

as product cure times.
Make sure all PVC union connections are securely

hand tightened, and that all union connections use

an OĆring.
Fill the footbath basin at least 3Ćinches above the

top of the suction cover.
Turn on the BodySpa for about five minutes, and

check all visible connections for leaks.
Turn off the BodySpa.
Open the tower, and inspect all piping connections

for leaks.
Check the connections on the back surface of the

face wall, and check all wall and floor joints for

leaks.
Close the tower. Thread in and securely wrench

tighten two 3/8Ćinch bolts. Do not overtighten.

CLEANĆUP AFTER INSTALLATION

Clean the Custom BodySpa room with a mild,

nonĆabrasive detergent and warm water. Do not use

abrasive cleansers.
Remove stubborn stains and paint from the tower

surfaces with turpentine or paint thinner. Remove

dried plaster by carefully scraping with a dullĆedged

piece of wood. Do not use metal scrapers, wire

brushes, or other metal tools. Remove residual

plaster by applying a powderĆtype detergent to a

clean, damp towel to provide mild abrasive action.

Check Point #10

-

Ensure that all connections are securely tight.

-

Fill the footbath basin with water to 3Ćinches over the top of the

suction cover.

-

Run the bodyspa, turn off, and drain the water. check for leakage.

-

Open the tower, inspect for leakage, and close and secure the

tower.

INST

ALLA

TION

INST

ALLA

TION

INST

ALLA

TION

Advertising