OPERATION OF THE SYSTEM

WTC 600 LP / MP

Service Handbook 08.2004

3.3.2.4

Float Switch

Connect the signal lines of the enclosed float switch to clamps 6/7 (8S3 option) of the
connecting terminal – compare wiring diagram in the switching box. Upon installation, adjust a
switching hysteresis of at least 300 liters between the switching-on and switching-off point.

3.3.2.5

Reverse Osmosis System

The WTC 600 LP/MP is connected to the following power supply:

- 400 V / 50Hz, 3Ph + N + PE or 230 V / 50Hz, 1Ph + N + PE (depending on type of system)

- Fuse protection 16 A

- RC protective switch 30 mA from source of power supply (check if in existence or have

confirmed in writing).

3.4

Starting Operation

Operation of the individual equipment components is started in the following sequence:

- Fill the preliminary filter and start operation by backwashing (3.4.2)

- De-conserve reverse osmosis (3.4.3.7)

- Fill metering container and start operation (3.4.1)

- Start the operation of the reverse osmosis (3.4.3.8)

3.4.1

Metering Station

Pushbutton for venting in “continuous operation” (14/3).

Operating mode on “Manual” (14/2)!
Change the operating mode by pressing the
"Mode" key (14/2).

Modul

Lift

Frequency Meter-

(14/1)

(14/4)

ing

Pre-
chlorination

40%

70%

3.2.2

Antiscalant

40%

50%

3.2.3

Post
clorination

40%

70%

3.2.4

Flocculation

40%

70%

3.2.5

Table 14

Checking pump settings

Adjust the lift only when the
pump is running. Danger of
damaging!

Figure 14 Metering station

2

1

4

3

NOTE

NOTE