Connecting the pg-5g/ pg-5h interface cables, Installing the dfk-3d panel kit, Ninstalling the sub-panel – Kenwood TM-V71E User Manual

Page 98

Advertising
background image

90

cONNecTINg The Pg-5g/ Pg-5h INTerface cableS

The PG-5G package comes with cable w (below).
The PG-5H packages comes with cables q and w (below).

q

Data communications cable

w

Serial communications cable

To PC

audio terminal

To PC 9-pin

D-SUB terminal

Note: When connecting the regular cable in your vehicle, the terminal may disconnect due to

vibrations. Be sure to lock the cable in place.

INSTallINg The DfK-3D PaNel KIT

n

Installing the Sub-Panel

1 Detach the front operation panel from the

base unit, then remove the modular cable

from both sides.

2 Connect the 4-pin connector of the supplied

modular cable to the operation panel.

• Align the cable with the cable guide.

cable guide

PC terminal

PC terminal pins:

No. Name

I/O

Function

q

RTS

O

Request to Send

w

CTS

I

Clear to Send

e

TXD

O

Transmit Data

r

GND

GND

t

RXD

I

Receive Data

y

NC

u

NC

i

NC

• For DATA terminal, refer to page 83.

Data communications cable pin configuration

Serial communications cable pin configuration

(cross connection)

Pink: To microphone input terminal

Green: To line out terminal

Advertising
This manual is related to the following products: