Porsche 944 User Manual

Page 160

Advertising
background image

24/28

Fuel System - Electronic Control

944 S/944 S2

d) Ignition timing test

Ignition timing is checked with the engine at

operating temperature.

Ignition timing and engine speed can be

read direct in the "actual value" menu with a

9288 System Tester.

Test value: (944 S + 944 S2)

At 840 +- 40 rpm 10° +- 3°

e) Activation of high tension end

(if ignition sparks are not triggered)

Ignition triggering signal can be simulated for

fast troubleshooting of the ignition end. This

requires connecting the oscilloscope term. 4

tester lead on the ignition lead betw. ignition

cail and high tension distributor (term. 4).

Disconnect DME control unit plug.

Turn on ignition.

If battery voltage is new supplied

intermittently to terminal 1 of the control unit

with help of a test lead (e.g. control unit plug

term. 18), a high tension peak must be

displayed on the oscilloscope each time

(ignition triggering).

If there is no signal, check:

-

Power supply to ignition final stage and

ignition coil.

- Ground connection for ignition final stage

(ground point on left front side member).

- Plug connections on ignition final stage,

ignition coil and high tension distributor.

-

Components responsible for high tension

(for example: ignition coil, ignition leads,

spark plug connectors, etc.).

- Power flow in lead between control unit

plug and ignition final stage term. 5.

D 24/28 - 26

DME - Diagnosing/Troubleshooting

Printed In Germany - XXI, 1989

Advertising