Porsche 944 User Manual

Page 22

Advertising
background image

03

Maintenance, Self-diagnosis

944

Initiale the air-conditioning control terminal

41

testing step.

Display:

Switch on the air-conditioning system.

The LED must go off and the display will

appear after approx. 3 s.

Display:

If this is not the case, an error has occurred

in

the area of the air-conditioning system's

wiring.

In the event of an error, check with reference

to the circuit diagram.

Do not switch off the air-conditioning system.

Initiate the air-conditioning control terminal

40

testing step.

Display:

Switch off the air conditioning system.

The LED must go off and the display will

appear after approx. 3 s.

Display:

If this is not the case, an error has occurred

in

the area of the air-conditioning system's

wiring.

In the even! of an error, check with reference

to the circuit diagram.

03 - 10

Actuator and input signal function checking

Printed in Germany - XVI, 1987

Advertising