TDK 2U GENESYS 5KW User Manual

Page 79

Advertising
background image

83-515-000 Rev. B

71

CAUTION

To prevent damage to the unit, do not program the output voltage and
current to higher than the power supply rating.

NOTE

J1-8 and J1-12 must be shorted together with a wire jumper.

NOTE

J1-8 and J1-12 must be shorted together with a wire jumper.

NOTE

SW1 position 3 and 4 must be in the Up position for operation
with 4-20mA Isolated Programming and Monitoring.

8.4 SETUP AND OPERATING INSTRUCTIONS

8.4.1 Setting up the power supply for 0-5V/0-10V Isolated Programming and Monitoring
Perform the following procedure to configure the power supply:

1. Turn the power supply AC power switch to Off.
2. Connect a wire jumper between J1-8 and J1-12 (refer to Table 4-4).
3. Set the Setup switch SW1, positions 1 and 2 to the UP position.
4. Set SW1, position 3 to select the Programming Voltage Range: Down=0-5V, Up=0-10V.
5. Set SW1, position 4 to select the Monitoring Range: Down=0-5V, Up=0-10V.
6. Ensure that SW1, positions 7 and 8 are in the Down position.
7. Connect the programming sources to the mating plug of the Isolated Programming connector.

Observe for correct polarity of the voltage source.

8. Set the programming sources to the desired levels and turn the power supply ON.

8.4.2

Setting up the power supply for 4-20mA Isolated Programming and Monitoring

Perform the following procedure to configure the power supply:
1. Turn the power supply AC power switch to Off.
2. Connect a wire jumper between J1-8 and J1-12 (refer to Table 4-4).
3. Set the Setup switch SW1, positions 1 and 2 to the Up position.
4. Set SW1, position 3 to the Up position.
5. Set SW1, position 4 to the Up position.
6. Ensure that SW1 positions 1 and 2 to their Up position.
7. Connect the programming source to the mating plug of the Isolated Programming connector.

Observe for correct polarity of the voltage source.

8. Set the programming sources to the desired levels and turn the power supply ON.

Advertising