Meter wiring detail, Top rear view – Xantrex Technology LINK 10 User Manual

Page 14

Advertising
background image

14

Meter Wiring Detail

Make the necessary wire connections to the Link 10 as
shown in the following diagram:

CAUTION

Use correct sized screwdriver for
terminal screws. Tighten firmly
but do not over-tighten to avoid
damage

Color code shown for
Xantrex 4 twisted pair
cable. P/Ns below:

P/N 84-2014-00 -25'
P/N 84-2015-00 -50'

1) For Voltages above 50 V a Prescaler must be used. See page 44.

DC - Meter Negative (BLACK) [1]

Shunt Sense Lead Load Side (GREEN) [2]

Shunt Sense Lead Battery Side (ORANGE) [3]

Battery Volt Sense (0–50 V DC

1

)(BLUE) [4]

DC + Meter Power (9.5–40 V DC) (RED) [5]

Optional Temperature Sensor Input [6]

Optional Low Battery Alarm [7]

Optional Temperature Sensor Ground [8]

Top Rear View

Advertising
This manual is related to the following products: