2 operation – PowerWalker VFI 10000TCP 3_1 User Manual

Page 5

Advertising
background image

2

An appropriate disconnect device as short-circuit backup

protection should be provided in the building wiring

installation.

For three-phase equipment connection to an IT power system,

a four-pole device which disconnect all phase conductors and

the neutral conductor should be provided in the building wiring

installation.

This is permanently connected equipment, it must be installed

by qualified maintenance personnel.

Earth connection essential before connecting to the building

wiring terminal.

1.2 Operation

Do not disconnect the earth conductor cable on the UPS or the

building wiring terminals in any time since this would cancel

the protective earthing of the UPS system and of all connected

loads.

The UPS output terminal block may be electrically lived even if

the UPS system is not connected to the building wiring

terminal.

In order to fully disconnect the UPS, turn the M1/M2/N input

breaker in the “OFF” position

(

for PowerWalker VFI

10000-20000 TP 3/1), turn the R/S/T/N input switch in the

“OFF” position (for PowerWalker VFI 10000TCP 3/1), then

disconnect the mains lead.