Front side, Openings for input and output cable connections, Please remove the plate before drilling any holes – GE Industrial Solutions SG Series 400 & 500 Installation Guide User Manual

Page 13

Advertising
background image

Openings for input and output cable connections

2,050mm

80.71"

200mm

7.88"

1.97

"

40mm

1.58"

50m

m

33.4

7"

29.5

3"

750

mm

850

mm

SGS

U_4

00-

500

_S2

_UP

S vi

ew

top_

01U

S

Utility input
Output Load

Battery

Fig. 3.4.1-2 Opening on top of the cabinet for input and output cables

SG Series 400 & 500
openings are provided
on the top (*) and the
bottom (*) of the UPS
for the connection of
input and output
cables.

Pay attention to the
position of these
openings, when
choosing the
placement of the UPS.
These openings are
covered with a
protective plate.

Utility input
Output Load

Battery

7.88"

200mm

1.19"

700

mm

27.5

6"

850

mm

33.4

7"

80m

m

3.15

"

2,050mm

80.71"

30mm

SGS

U_4

00-5

00_

S2_

UPS

vie

w b

otto

m_0

1US

*) Please

remove

the plate before drilling
any holes.

Fig. 3.4.1-3 Opening on the bottom of the cabinet for input and output cables



Fixing of the UPS cabinet on the floor
The UPS cabinet is free standing and normally does not require to be bolted to the floor.
The UPS cabinet can be fixed however to the floor by bolting it with the supporting blocks to the
floor. See Fig. 3.4.1-4.

Ш 0.47305"

Ш 12mm

Front side

35mm

1.378"

1580mm

62.205"

35mm

1.378"

2.3

63"

60

m

m

28.

740"

730mm

2.

363"

60mm

=

=

30.0

40"

76

3m

m

575.5mm

22.658"

559.5mm

22.028"

33.268"

845mm

SGSU_400-500_S2_UPS view bottom_02US

Fig. 3.4.1-4 Fixing of the UPS cabinet on the floor

Modifications reserved

Page 13/41

OPM_SGS_ISG_M40_M50_2US_V021.doc

User Manual SG Series 400 & 500 UL S2

Advertising