5 ventilation and cooling, Ventilation and cooling – GE Industrial Solutions SG Series 400 & 500 Installation Guide User Manual

Page 15

Advertising
background image

3.5 VENTILATION AND COOLING

Fig. 3.5-1 Installation on plain floor

Fig. 3.5-2 Installation on raised floor



The heat produced by the UPS is transferred to the environment by its ventilation.

Air inlets for UPS ventilation are located on the front of the UPS, while air outlets are on top of the
cabinet.

UPS produces maximum heat dissipation while operating in Double Conversion Mode, design ventilation
or cooling system to meet heat dissipation for this operating mode. Install suitable ventilation or cooling
system to extract the heat from the UPS room.

NOTE !

Do not put anything on the top of the cabinet.


Air filtration systems could be required when the UPS operates in a dirty environment.

Contact your Dealer or the nearest Service Center for appropriate solutions.

In order to prevent overheating of the UPS, the available air intake flow rate must exceed the total air
exhaust flow rate requirement of the UPS system.

The below table indicates the heat dissipation at full load at PF = 0.9 lag. and charged battery, up to
3,280 ft (1,000 m) altitude, for cooling air 77°F (25°C) to 86°F (30°C).

Losses

Cooling air flow

UPS rating with options

BTU / hr

kW

CFM

m

3

/ h

SG Series 400 with 5

th

filter

78,499 23.0 3,949 6,709

SG Series 400 with 5

th

& 11

th

filter

79,864 23.4 4,018 6,825

SG Series 400 in eBoost™ Operation Mode

13,652 4.0 687 1,167

SG Series 500 with 5

th

filter

99,659 29.2 5,013 8,517

SG Series 500 with 5

th

& 11

th

filter

101,366 29.7 5,099 8,663

SG Series 500 in eBoost™ Operation Mode

17,065 5.0 859 1,459

Modifications reserved

Page 15/41

OPM_SGS_ISG_M40_M50_2US_V021.doc

User Manual SG Series 400 & 500 UL S2

Advertising