3.8.2 Power connection with common input utility

PE

SGSU

_400-

500_S

2_UPS

conn

ection

com

mon_

GE_01

US

Position of the PE bolt in case the

cable input is from the bottom of the UPS

PE

PE Input Utility

PE Load

PE

Typical installation using

common NEMA two hole lugs

Utility Neutral

Load Neutral

L3-1

1 - INPUT UTILITY

RECTIFIER & BYPASS

L1-1
L2-1

Typical installation using

common NEMA two hole lugs

Load

L1

L2

L3

+

-

Fig. 3.8.2-1 Power connection with Common Input Utility



Use 1/2” bolts for the cable connections on INPUT / OUTPUT power wiring Bus Bars.
Cable terminations are to the Rectifier Input / Output Bus Bars as shown above.
Connect wire to the Bus Bars using appropriate tools and appropriate torque.
Torque specification for two hole lugs on Bus Bars: see Section 3.8.1.

Common Input Rectifier / Bypass

L1-1

Rectifier + Bypass Phase A

L2-1

Rectifier + Bypass Phase B

L3-1

Rectifier + Bypass Phase C

N

Utility Neutral

PE Input Utility

Ground

The interconnection bus bars BR1, BR2 and BR3 MUST REMAIN CONNECTED (see Fig.
3.8.3-3)
.


Output Load

L1

Load Phase A

L2

Load Phase B

L3

Load Phase C

N

Load Neutral

PE Load

Load Ground