2 layout, 1 layout sg series 400 & 500, Layout – GE Industrial Solutions SG Series 400 & 500 Installation Guide User Manual

Page 9: Layout sg series 400 & 500

Advertising
background image

2 LAYOUT


2.1 LAYOUT SG SERIES 400 & 500

SGS_400-500_S2_U

PS_GE_02

Fig. 2.1-1 SG Series 400 & 500 general view

Q1

0 OFF

I O

N

Q2

0 OFF

I O

N

SGSU_400-500_S2

_UPS_03

11
22

10
21

2

1

18

12 13

16

14 15

17

7

1 2 3 4

6

5

19 20

8 9

4

3

2

1

15

14

13

12

9

8
20

19

5

6 7
17

16

18

21

10

22

11

Fig. 2.1-2 SG Series 400 & 500 general view with open doors



Q1

0 OFF

I O

N

Q2

0 OFF

I O

N

SGSU_400-500_S2

_UPS_04

1

4

3

XA/XB CR

2

Q1

Q2

Fig. 2.1-3 SG Series 400 & 500 general view with optional 5

th

harmonic filter and

removed protection panels

1

Opening for top cable entry

(*)

2 Opening for bottom cable

entry

(*)

3

Bus bars for Utility input and
Load output

4

Bus bars for external Battery
connection

CR Connectivity

Rack

Q1 UPS

output

switch

Q2 Manual Bypass switch (option)

XA Terminals for 24Vdc Auxiliary

Power Supply connection

XB Terminals for EPO connection

*)

Remove this panel or provide
means to capture metal filings

from cutting conduit entry holes

■)

Dual mains customer
connection bars are optional

Modifications reserved

Page 9/41

OPM_SGS_ISG_M40_M50_2US_V021.doc

User Manual SG Series 400 & 500 UL S2

Advertising