3.8.3 Power connection with dual input utility (option)

Position of the PE bolt in case the
cable input is from the bottom of the UPS

PE

SGSU

_400-5

00_S2

_UPS c

onnec

tion se

parate

_GE_0

1US

PE

PE

Typical installation using

common NEMA two hole lugs

PE Input Utility

PE Load

Utility Neutral

Load Neutral

Load

Typical installation using

common NEMA two hole lugs

2

- I

NP

UT

U

TI

LI

TY

B

YP

AS

S

(o

pt

io

n)

L1-2

L3-2

L2-2

L1

L2

L3

L3-1

1 - INPUT UTILITY

RECTIFIER

L1-1
L2-1

+

-

Fig. 3.8.3-1 Power connection with Dual Input Utility (option)


Use 1/2” bolts for the cable connections on INPUT / OUTPUT power wiring Bus Bars.
Cable terminations are to the Rectifier Input / Output Bus Bars as shown above.
Connect wire to the Bus Bars using appropriate tools and appropriate torque.
Torque specification for two hole lugs on Bus Bars: see Section 3.8.1.

Dual Input Configuration Rectifier / Bypass (option)

L1-1

Rectifier Phase A

L1-2

Bypass Phase A

L2-1

Rectifier Phase B

L2-2

Bypass Phase B

L3-1

Rectifier Phase C

L3-2

Bypass Phase C

PE Input Utility

Ground

N - Bypass

Bypass Neutral

For dual input configurations, a neutral conductor is required from the bypass source
only.
Always verify that the received UPS is as per the configuration ordered.
While installing UPS dual source, shorting jumpers BR1
, BR2 and BR3 should not be
present. See Fig. 3.8.3-3
.

Output Load

L1

Load Phase A

L2

Load Phase B

L3

Load Phase C

N

Load Neutral

PE Load

Load Ground

Modifications reserved