3.9.3 Control bus cable location

WARNING !

This operation must be performed by QUALIFIED SERVICE PERSONNEL ONLY before
the initial start-up.
ENSURE THAT THE UPS INSTALLATION IS COMPLETELY POWERED DOWN.


SGS_400-500_S2_R

PA control bus cab

le_01US

Q1

0 OFF

I O

N

Q2

0 OFF

I O

N

Next Parallel Unit

17

16

4

3

15

14

5

2
13

1

12

10

20

19

9

8

21

7
18

6

11

22

Fig. 3.9.3-1 View electronic module on intermediate unit

Access to the control bus
connection.


The control bus connection
between parallel units must be

made on the electronic module
(P34 – Bus Interface) situated at
the inside of the UPS door.


Next parallel unit

JA

SGSU_400

-500_S2_

RPA contr

ol bus cab

le_02US

A

JA1

JA2

JB

B

JA1

JA2

Fig. 3.9.3-2 Front view electronic module on intermediate unit

Control bus cables connection.

• Plug the cables JA

(1/2/3/4/5) and JB
(1/2/3/4/5)
onto the RJ

connectors JA and JB
located on parallel bus PCB

P34 – Bus Interface (going
to “P13 – RPA Board” J52(A)
and J62(B).

• Fix both cables JA

(1/2/3/4/5) and JB
(1/2/3/4/5) to parallel bus
socket connecting the cable
shield to ground by means

the cable clamps “A“.

Modifications reserved

Page 35/41

OPM_SGS_ISG_M40_M50_2US_V021.doc

User Manual SG Series 400 & 500 UL S2