Ups 1, Ups 2, Service center – GE Industrial Solutions SG Series 400 & 500 Installation Guide User Manual
Page 36: Next parallel unit 3, 4, 5, 6
SGSU_400-500_S2_
RPA control bus cab
le_03US
Next Parallel
Unit 3, 4, 5, 6
I O
N
0 OFF
Q1
Q2
0 OFF
I O
N
I O
N
0 OFF
Q1
Q2
0 OFF
I O
N
UPS 1
JA
JB
UPS 2
JA1
JB1
JA
JA1
JB
JB1
JA2
JB2
JA1
JB1
JA2
JB2
17
1 6
4
3
15
14
5
2
13
1
12
10
20
19
9
8
21
7
18
6
11
22
17
16
4
3
15
14
5
2
13
1
12
10
2 0
19
9
8
21
7
18
6
11
22
Fig. 3.9.3-3 Control bus cable routing and connection
Control bus cables routing
Place and fix the cables JA-1/2/3/4/5 and JB-1/2/3/4/5 inside the UPS cabinets in the position
illustrated in the drawing.
NOTE !
Pay attention when cabling and routing the bus cables JA and JB inside the UPS
cabinet.
In case one unit should be removed from the parallel system, the bus cables JA
and JB must be removed from the cabinet without disconnecting them from the
metal plate where the sockets JA and JB are located.
For reliability reasons the cables JA-1/2/3/4/5 and JB-1/2/3/4/5 connecting the units should be run
in separated protected conduits (as indicated in Fig. 3.9.3-3) separated from the power cables.
It is important that the cable JA must be the same length as cable JB.
WARNING !
Connection and commissioning of an additional UPS to an existing parallel system,
must be performed by a GE SERVICE ENGINEER from of your
Service Center.
Modifications reserved
Page 36/41
OPM_SGS_ISG_M40_M50_2US_V021.doc
User Manual SG Series 400 & 500 UL S2