Ups 1, Ups 2, Service center – GE Industrial Solutions SG Series 400 & 500 Installation Guide User Manual

Page 36: Next parallel unit 3, 4, 5, 6

Advertising
background image

SGSU_400-500_S2_

RPA control bus cab

le_03US

Next Parallel

Unit 3, 4, 5, 6

I O

N

0 OFF

Q1

Q2

0 OFF

I O

N

I O

N

0 OFF

Q1

Q2

0 OFF

I O

N

UPS 1

JA

JB

UPS 2

JA1

JB1

JA

JA1

JB

JB1

JA2

JB2

JA1

JB1

JA2

JB2

17

1 6

4

3
15

14

5

2
13

1
12

10

20

19

9

8

21

7
18

6

11

22

17

16

4

3
15

14

5

2
13

1
12

10

2 0

19

9

8

21

7
18

6

11

22

Fig. 3.9.3-3 Control bus cable routing and connection


Control bus cables routing

Place and fix the cables JA-1/2/3/4/5 and JB-1/2/3/4/5 inside the UPS cabinets in the position
illustrated in the drawing.

NOTE !

Pay attention when cabling and routing the bus cables JA and JB inside the UPS
cabinet.
In case one unit should be removed from the parallel system, the bus cables JA
and JB must be removed from the cabinet without disconnecting them from the
metal plate where the sockets JA
and JB are located.


For reliability reasons the cables JA-1/2/3/4/5 and JB-1/2/3/4/5 connecting the units should be run
in separated protected conduits (as indicated in Fig. 3.9.3-3) separated from the power cables.

It is important that the cable JA must be the same length as cable JB.



WARNING !

Connection and commissioning of an additional UPS to an existing parallel system,
must be performed by a GE SERVICE ENGINEER from of your

Service Center.

Modifications reserved

Page 36/41

OPM_SGS_ISG_M40_M50_2US_V021.doc

User Manual SG Series 400 & 500 UL S2

Advertising