Ac b d – GE Industrial Solutions SG Series 400 & 500 Installation Guide User Manual

Page 23

Advertising
background image

CAUTION !

Panel “A, B, C and D” should never be removed or replaced with power applied to the
UPS.
This panel is in close proximity to 480V live buss bars.
Always disconnect the rectifier, bypass, load and battery sources from the UPS
before removing or replacing this panel.
If not serious injury or death could occur!


Access to power wiring terminals for the cable connections.

Q1

0 OFF

I O

N

Q2

0 OFF

I O

N

SGSU_400-500_S2

_UPS connection_0

1US

Bottom entry cables

Please remove the plate
before drilling any holes

!

Please remove the plate
before drilling any holes

!

Detail of the power wiring terminal for the AC input/output

Detail of the power wiring terminal for external battery connection

2"

51mm

0.57

"

14.5

mm

2"

51mm

2"

51mm

1.02"

26mm

Ø 0.55" / 14mm

Ø 0.55" / 14mm

1.75"

44.5mm

0.57

"

14.5

mm

31.5

"

80m

m

1.75"

44.5mm

0.79"

20mm

1.97" 50mm

0.98" 25

m

m

0.98" 25

m

m

A

C

B

D

Top entry cables

) Dual mains customer connection bars are optional

) Manual Bypass switch is optional

*

*

Fig. 3.8.1-1 Access to the input / output connections


To access input, output and Battery Connections proceed as follows:
• Remove the protection panel “A, B and C.
• Remove the UPS side panel “D.

Modifications reserved

Page 23/41

OPM_SGS_ISG_M40_M50_2US_V021.doc

User Manual SG Series 400 & 500 UL S2

Advertising