3.7 ELECTRICAL WIRING

WARNING !

UPS installation and connection must be performed by QUALIFIED SERVICE
PERSONNEL ONLY.
It is the responsibility of the installation technician to ensure that all local and
national electric codes are adhered to.

3.7.1 Utility input connection

NOTE !

Ensure that the AC and DC external isolators are OFF and locked out to prevent their
inadvertent operation.
Do not apply power to the equipment prior to the commissioning by a QUALIFIED
SERVICE ENGINEER.
Before any other input connection, connect and check the grounding wire.


The UPS has available input terminations for the Rectifier and Bypass.
The unit may be powered from a common input source or dual input (option) sources if desired.

Common Input Rectifier & Bypass

The same power source is to be used for both Bypass Supply and Rectifier Input (input F3).
Bear in mind that when the Utility Fuses are opened there is a supply failure to the Rectifier as well as
to the Bypass and Manual Bypass.

In this case, the interconnection links BR1, BR2 and BR3 on the input terminals or bus
bars MUST REMAIN CONNECTED. See Fig. 3.8.3-3
.

Dual Input Configuration Rectifier & Bypass (option)

The Bypass and Rectifier inputs are to be powered from different Utility supplies (F1 and F2 inputs).
In this case, when the Rectifier Input Fuses are opened, the Bypass and the Manual Bypass are
supplied by the other source.

Always verify that the received UPS is as per the configuration ordered.
While installing UPS dual source, shorting jumpers BR1
, BR2 and BR3 should not be
present. See Fig. 3.8.3-3
.

Common Input Rectifier & Bypass

Dual Input Configuration Rectifier & Bypass (option)

Fig. 3.7.1-1 Common Input Rectifier & Bypass

Fig. 3.7.1-2 Dual Input Configuration Rectifier & Bypass (option)

1 = Rectifier
2 = Inverter

3 = Automatic Bypass
4 = Manual Bypass Q2 (option)

6 = Load
5 = Utility input

7 = Battery

Modifications reserved