Rear side – GE Industrial Solutions SG Series 400 & 500 Installation Guide User Manual

Page 17

Advertising
background image

Transport fastening to remove

Rear side

SGSU_400

-500_S2_U

PS transpo

rt fastenin

g_01

Fig. 3.6-3 Transport fastening to remove


The chokes fitted in the UPS cabinet are supported both at the chassis.

These supports must be removed before placing the cabinet in the final location.


These supports are yellow and are indicated with an appropriate symbol on the assembly layout
drawing (see Fig. 3.6-1).



For parallel systems, the delivery also includes the bus control cables for inter-
connecting the UPS modules.



Packing material recycling
GE
, in compliance with environment protection, use only environmentally friendly
material.
UPS packing materials must be recycled in compliance with all applicable
regulations.

Modifications reserved

Page 17/41

OPM_SGS_ISG_M40_M50_2US_V021.doc

User Manual SG Series 400 & 500 UL S2

Advertising