Figure 24. floor layout for case two, Table 9. ied addresses for case two, Plc 90/30 – GE Industrial Solutions POWER LEADER PMCS Network Architecture Guide User Manual

Page 38: Epm 3720, Multilin 269, Multilin 565, Modbus concentrator, Enhanced microversatrip, Power leader meter, Power leader epm

Advertising
background image

Power Management Control System
Chapter 2 – Network Design

28

Modbus

Concentrator

EMVT

Segment 5

Commnet Segment 1

EMVT

POWER

LEADER

Meter

EMVT

PLEPM

EMVT

EMVT

ECM

MDP

POW ER LEADER

Meter

EMVT

POWER

LEADER

Meter

Segment 4

Segment 2

Segment 3

Bill's Office

GHO Corp Machine Shop -
network wiring diagram

350'

550'

100'

Terminating
Resistor

Multilin 565
Feeder Management Relay
at main power feed

PLC 90/30
Programmable Logic Controller

EPM 3720

EPM 3720

EPM 3720

Multilin 269

600'

600'

Assembly Line Area

Milling Area

Machining Area

Lathe Area

Network 4 - 19.2 kbaud

Network 3 - 19.2 kbaud

N

et

w

or

k

2

- 2

40

0

ba

ud

N

et

w

or

k

1

-

96

00

b

au

d

RS485 networks
terminated at host PC

Facility Two

Long-range RS485 cable run
3500 feet

RS485 repeater

300'

Terminating
Resistor

RS485 repeater

Figure 24. Floor layout for Case Two.

He must also bear in mind proper shield grounding
considerations – each RS-485 IED grounded at only one
point and no two IED’s grounds connected (Rule 4,
Section 2-4).

Bill checks Table 4 for the commnet wiring rules and finds
that he must keep his POWER LEADER Meters on
separate commnet networks, limit his commnet IEDs to
four per segment, and keep each segment under 1000 feet
(unless he uses repeaters). The commnet segments he has
planned satisfy all these rules.

Because his cabling limits are met, Bill selects Modbus-
equivalent addresses for the IEDs and adds them to his
address chart for future reference. His updated address
chart is shown in Table 9.

IED Type

Physical Location

Modbus Address

PLC 90/30

Assembly line

01

EPM 3720

Milling

02

EPM 3720

Lathe area

03

EPM 3720

Machining

04

Multilin 269+

Assembly line

05

Multilin 565

Power Intake area

06

Modbus

Concentrator

Facility 2, north wall

10

Enhanced

MicroVersaTrip

Facility 2, Segment 1

33

Enhanced

MicroVersaTrip

Facility 2, Segment 2

34

Enhanced

MicroVersaTrip

Facility 2, Segment 2

35

Enhanced

MicroVersaTrip

Facility 2, Segment 3

36

Enhanced

MicroVersaTrip

Facility 2, Segment 5

37

Enhanced

MicroVersaTrip

Facility 2, Segment 5

38

POWER

LEADER Meter

Facility 2, Segment 3

39

POWER

LEADER Meter

Facility 2, Segment 4

40

POWER

LEADER Meter

Facility 2, Segment 5

41

POWER

LEADER EPM

Facility 2, Segment 1

42

MDP

Overcurrent

Relay

Facility 2, Segment 4

43

Spectra ECM

Facility 2, Segment 3

44

Table 9. IED Addresses for Case Two.

Bill next checks Chapter 3 for physical wiring
requirements and rules. He knows he needs Belden 3074F
cable for the new RS-485 wiring to extend RS-485 Network
3 to the RS-485 repeater for the jump to Facility Two and
to make the connection to the Modbus Concentrator from
the RS-485 repeater in Facility Two. He moves the
terminating resistor from the end of RS-485 Network 3 out
to the new end at the Modbus Concentrator in Facility
Two.