6. Inspections and maintenance

6.1 List of inspections

TYPE OF THE

INSPECTION

BY WHOM

HOW OFTEN

WHAT TO DO/CHECK

A. General visual

inspection

-Customer

-Trained technician

Every 6-12 months

Check for damages or cracks of the
frame, adapter or arc chute

Check for missing screws or caps

Check for damaged labels

Check for corrosion

Check for distinct manifestations of flame
or smoke at the frame

Clean the breaker from dirt and dust

Clean and degrease the copper terminals

B. General functional
inspection

-Customer
-Trained technician

Every 6-12 months

Manually close and open the breaker to
check the drive and mechanism

Close the breaker electrically and open by
trip unit(s) releasing, to check controls

C. Inspection of the arc
chute and contact

system

-Customer
-Trained technician

Every 6-12 months
or after:

high short circuit
opening at >25 kA

>300 openings at load
current

>100 openings at over

current load (2-3 x In)

It is recommend to carry

out inspection of contact
system after breaking of

equivalent of 150MA

2

s total

let through energy.

Check for wear of the arc runners; shall
not exceed 30 % of its cross section

Check for wear of the pre-arcing contact.
It shall not exceed 2 mm [0.08 in].

Check for wear of the main contacts at
fixed and flexible sides; shall not exceed

1.5 mm [0.06 in] of its depth.

Check for wear of the arc chute plates;
check for deposits inside of arc chute, this
area shall be free of deposits.

Check for wear of protective walls; shall
not exceed 1 mm [0.04 in].

Check for contact tilt and gaps.

D. Inspection of the
screw/bolt connections

-Customer
-Trained technician

Every 6-12 months
or after every inspection:

of the arc runners

of the contacts

of the arc chute

Check the position of the countersunk screws
in the sidewalls.

Check for tightness or use torque tool (torque

in SI and Imperial units):

M8 ~20 Nm [~ 177 in-lbs]

M6 ~10 Nm [~ 88 in-lbs]

M5 ~5 Nm [~ 44 in-lbs]

M4 ~3 Nm [~ 26 in-lbs]

E. Inspection of the

mechanic components

-GE

-Service technician

Every 5 years

or

After 5.000 openings

Carry out inspection “B” above

Check out settings of the main contacts
and auxiliary switch

Check out upper dumper of the
mechanism; no cracks, deformation or

heavy discoloration; hard consistency;
without punctures

Check out main flexband breakage; shall
not exceed 30 % of its cross section

Check out wear of mini flexband; shall not
exceed 30 % of its cross section

Clean and degrease UVR latch and quick
latch of the mechanism. Apply dash of

Beacon EP2 grease afterwards.


Required tools:
Cleaning tissue; abrasive paper; manual closing lever; hexagon wrenches SW5, SW6; Torx® wrenches size 30, 40, 45; small and

medium screwdrivers; ratchet with 10 mm hex cap; pliers; tongs.

Dispose of the breakers if required:
Pay attention to the national and local regulations of disposal!