GE Industrial Solutions GERAPID 2607, 4207, 6007, 8007 with arc chutes 1X2, 1X4, 2X2, 2X3, 2X4 User Manual

Page 47

Advertising
background image

2010-06-07 S47183e rev.03

Design and specifications are subject to change without notice

47

Fig. 55-4 Unscrew all the plugs from control boards

Fig. 55-5 Pull out the plugs of the control boards. Pull out

selected control board. Insert new control board


Listen that both, the isolation plate at the side of
equipment and the isolation plate at the side of

soldering, were inserted!

Fig. 55-6 Plug in all control plugs and tighten it by the

screws.

Fig. 55-7 Pay attention, that no cables will be pinched
between box and front cover during closing!

Fig. 55-8 Carefully replace the control box front cover and

attach the with the four screws


Put on plugs X2…X6, fix the screws of the plugs and
switch on control voltage.


Checking the breaker:

Open and Close the breaker 3 times while it is
disconnected from the system (in the “Test-position“ of

the draw out version/the installation). The breaker must
open and close without a time delay over 400 ms.

If the test succeeds, reconnect the breaker to the main
circuit.