GE Industrial Solutions SG Series 10 – 20 – 30 – 40 kVA Operating Manual User Manual

Page 61

Advertising
background image

Modifications reserved

Page 61/83

OPM_SGS_USM_10K_40K_0US_V030.doc

Operating Manual SG Series 10 –20 – 30 - 40 kVA

3. Disconnect the Battery, in case of External Battery, from all Units.

• Wait 5 minutes for DC-Link Capacitors discharge

.

First operated unit

All other units of the system

4. Disconnect the Utility supply from all Units.

• All LED’s are OFF.

First operated unit

All other units of the system

END OF PROCEDURE

Advertising