5 reconnect a unit to a parallel system, Reconnect a unit to a parallel system – GE Industrial Solutions SG Series 10 – 20 – 30 – 40 kVA Operating Manual User Manual

Page 72

Advertising
background image

Modifications reserved

Page 72/83

OPM_SGS_USM_10K_40K_0US_V030.doc

Operating Manual SG Series 10 –20 – 30 - 40 kVA

7.4.5 Reconnect a Unit to a parallel system

1. Connect the Utility supply on the separated Unit.

• Press mute, to reset alarm and buzzer.

First operated unit

All other units of the system

2. Connect the Battery to the UPS separated by closing the external Battery Switch or

Fuses.

3. Close Q1 (Pos. I) on the separated Unit.

Rectifier starts automatically.

First operated unit

All other units of the system

4. Press inverter on ( I ) key on the separated Unit.

After Soft-start of the Inverter, the Inverter connects automatically to the other Units of
the parallel system.

First operated unit

All other units of the system

END OF PROCEDURE

Advertising