GE Industrial Solutions SG Series 10 – 20 – 30 – 40 kVA Operating Manual User Manual

Page 74

Advertising
background image

Modifications reserved

Page 74/83

OPM_SGS_USM_10K_40K_0US_V030.doc

Operating Manual SG Series 10 –20 – 30 - 40 kVA

3. Disconnect the Battery from all Units.

• Wait 5 minutes for DC-Link Capacitors discharge

.

First operated unit

All other units of the system

4. Disconnect the Utility supply from all Units.

All LED’s are OFF.

First operated unit

All other units of the system

END OF PROCEDURE

Advertising