Operating Manual SG Series 10 –20 – 30 - 40 kVA

4. Press inverter on ( I ) key on first unit.

• Soft-start of Inverter, indicated with blinking LED.
• At the end of Soft-start the LED Inverter remains lit.
• In case of sufficient output power, the output will transfer to Inverter.

UPS output LED indicates Load on Inverter and the LCD must display on the main

screen the status “LOAD ON INVERTER”.

First operated unit

All other units of the system

5. Press inverter on ( I ) key on all other units.

(Do not start the next Inverter until the sequence of the previous ends)
• As soon as the output power of the Inverters is sufficient to supply the Load, the output

of the units with running Inverter will transfer to Inverter.

• All LED’s Inverter, Load on Inverter and Load supplied are ON.

First operated unit

All other units of the system

The LCD must display on the main screen on all Units the status “LOAD ON INVERTER”.

END OF PROCEDURE




NOTE !

The Battery must be charged for at least 10 hours, in order to ensure the full
backup runtime in the case of a Utility Failure
.