2 upgrading from 7.0, Upgrading from 7.0 – Clear-Com HX System Frames User Manual

Page 19

Advertising
background image

3.2 Upgrading from 7.0

The following table lists the procedures that you will require to upgrade from Eclipse HX v7.0 to Eclipse HX v7.5.


Important note:

The table lists the procedures in the order in which they must be carried out.

To go to a procedure, click the cross-reference / link.

Order

System component

Upgrade procedure(s)

Notes

1

EHX configuration software

4.2

Backing up your EXH 7.0/7.1 configurations

4.3 Installing EHX

4.4 Importing your configurations into EHX

2

CPU card

5.7 Upgrading CPU Card U53 CPLD

5.8 Upgrading CPU Card U1 CPLD

5.9 Upgrading the CPU card U53 CPLD code with Xilinx tools

5.10 Upgrading the CPU card U1 CPLD code with Xilinx tools

3

E-QUE card

IVC-32 card

LMC-64 card

9.1 Identifying MK1 and MK2 E-QUE cards

9.2 Upgrading the E-QUE card (MK1)

9.3 Upgrading the E-QUE card (MK2)

The procedures used to upgrade E-

QUE cards to Eclipse HX v7.5 can

also be used to upgrade IVC-32 and

LMC-64 cards.

No FPGA or PROM upgrade is

required

12

Eclipse HX Upgrade Guide

Advertising
This manual is related to the following products: