Example scheduler program – SKC DataTrac for the Leland Legacy User Manual

Page 30

Advertising
background image

27

Example Scheduler Program

Click here

Click here

Example Scheduler Program

This example program demonstrates step-by-step how to use the SKC Pump
Scheduler window (see page 16) to set a program.

A sampling operation requires the Leland Legacy to sample at a constant fl ow of
10 L/min from 8:00 AM to 4:00 PM daily for one work week. Enter the parameters
as follows.

To Reset Volume, Time, Temperature, and Pump History

To set the fl ow rate:

Click on the Set Flow butt on. The Scheduler Set
Flow window opens. Click on the 10.0 butt on
then click on OK. “10.0” now appears in the Rate
cell of the Program Edit Bar.

To set the start/stop date:

Click on any Monday in the Calendar (do not select a date
already past). The date is now highlighted. Click on the
Start Date/Time cell in the Program Edit Bar. The date now
appears in the cell. Click on the Stop Date/Time cell to enter
the same date into the Stop Date cell.

To set the start time:

Click on the Clock at 8. The clock hands will now point
to 8:00 and it also appears in the digital display next to
the Clock. Click on the AM butt on, then click on the Start
Date Time cell of the Program Edit Bar; 8:00 AM now
appears in the cell.

To set the stop time:

Click on the Clock at 4. The clock hands will now point
at 4:00 and it also appears in the digital display next to
the Clock. Click on the PM butt on, then click on the Stop
Time cell of the Program Edit Bar; 4:00 PM now appears
in the cell. The Duration cell now displays 8 hours, which
is the length of the programmed operation.

Advertising