Example of basic erc2 positioning sequence, Erc-rac, Appendix – IAI America ERC2 User Manual

Page 177: 152 appendix

Advertising
background image



11. Appendix

152

Appendix

* Appendix

Example of Basic ERC2 Positioning Sequence

Given below is an example of basic sequence for creating a positioning sequence using the ERC2.

indicates PIO signals of the ERC2 controller.

Home return signal

HOME

HOME PEND

HEND

HOME

HEND

A

A

B

A

B

C

D

H

I

J

K

L

A C

D

C

C

I

H K

H

I

J

J PEND L

K

J PEND

L

Home return

request

Home return request

Positioning

start request

to position 1

Positioning

start request

to position 1

The positioning start request signal is converted to pulse in such a

way that one start signal is issued for one positioning operation.

Auxiliary start signal

for next positioning

({)

Check if positioning to the specified position has completed.

Positioning start pulse

to position 1

Auxiliary positioning start

pulse to position 1

Auxiliary positioning

start for position 1

Start check for position 1

Completion of positioning to

position 1

B

.. ERC-RAC

C

7

18 31.7

M8s1.25 Nut 3 types

2

37.5
20

43.5

118.5

B

L

F

49.7

A

8

2

118.5

20

Stroke

(300)

PIO type

SIO type

M8s1.25

4 - F

75.6

54

44

5

1

27

58

54

44

13 (2 flat faces)

(note) The angle of the 2 faces

on the actual product would

not be as shown in the drawing.

M.E.

M.E.

:

Mechanical End

50

100

150

200

250

300

L

A

B

C

293.5

175

393.2

91

1.6

343.5

225

493.2

141

1.7

393.5

275

593.2

191

1.8

443.5

325

693.2

241

2.0

493.5

375

793.2

291

2.1

543.5

425

893.2

341

2.2

Stroke

Weight [kg]

Cable joint

connector

Brake unit

Secure

at least

100

Teaching Port

Home

Rod Diameter

F

Appearance Figure for Brake-equipped Type
*Brake-equipped type is longer in 43.5mm and

weight heavier in 0.5kg than the standard type.

*There is no Teaching

Port for SIO Type.

Advertising