PCXZinstall

System Installation

System Evaluation

IMPORTANT!

Before determining what PCXZ components are to be purchased, and prior to the installation of any
equipment, it is essential that the fuel dispensing system be thoroughly evaluated. A site survey
should be completed, listing all the fuel dispensing related equipment.

The survey should include:

C

Model numbers of both dispenser and DBox

C

Manufacturer of equipment

C

Number of dispensers

C

A simple drawing describing the station layout

After your site survey is complete, Progressive International’s sales staff and technicians will be available to assist you in determining
which product(s) are appropriate for a particular fuel dispensing application.

System Installation Checklist

The fuel dispensing system should be installed in the following order.

1.

Install dispensers according to manufacturer’s specifications. See System Installation Requirements on
following page.

2.

Test dispensers with same brand console. See System Installation Requirements on following page.

3.

Mount PCXZ. Refer to PCXZ Installation section of this manual.

4.

Connect system components to specific dispenser box (DBox). If DBox is supplied by dispenser
manufacturer, see Dispenser & Reader Specific Installation section of this manual. If DBox is supplied by PIE, see PIE DBox
Installation Guide.

5.

Test with PCC Demo Test Program. Refer to Diagnostics section of this manual.

6.

Install POS application and test fully integrated system.

To ensure smooth system integration, it is recommended that the petroleum equipment service technician for the account be available to
resolve dispenser-related issues.