System installation requirements, Description of pcxz equipment – Progressive International Electronics PCXZ User Manual

Page 11

Advertising
background image

Progressive International Electronics

PCXZ

Version 4.2/April 2005

Page 3

PCXZinstall

System Installation

System Installation Requirements

In preparation for the PCXZ installation, ensure that the following requirements have been met.

1.

Following the manufacturer’s installation instructions, install the dispensing equipment (pumps
and data distribution boxes).

2.

Test all dispensers in stand-alone (manual) mode.

3.

Test all dispensers with same brand console to check basic dispenser functionality and
confirm a working communications link between the DBox and the dispensers. On dispensers
which have programmable identification numbers, ensure that the numbers are set correctly.
If multiple dispensers contain the same i.d. number, communication conflicts will occur.

All dispensers and communications should be functioning properly before proceeding with PCXZ
installation. If not, refer questions to the dispenser vendor/manufacturer.

Description of PCXZ Equipment

PCXZ systems are made up of the components listed below. Using this checklist, identify and
familiarize yourself with each of the components in your shipment. For further clarification, refer to the block
diagrams at the end of each dispenser section in the Dispenser & Reader Specific Installation portion of this manual.

PCXZ Equipment Checklist

U PCXZ Main Box — with connectors for POS, diagnostics and configurator box

U Configurator Box(es) — as many as 2 boxes which adapt the PCXZ to the appropriate brand(s) of fuel dispenser; wall

transformer attached

U Dispenser Connection Cable — standard 3-foot cable which connects the configurator box to the fuel dispenser

distribution box

U Config Cable — cable which connects the PCXZ board to the configurator box

U Installation Manual

U System/Test Diskette

Advertising