Armstrong World Industries 6100 User Manual

Page 16

Advertising
background image

16

Unit Configuration

Start-Up Procedure (Before “Power On”)

1. Examine the electrical compartment for any loose or disconnected component wiring. Check all

high voltage screw terminal connections at contactor, terminal strip, fuse block & power module for

tightness.

2. Remove Side Panel. Remove tank access panel by unscrewing all wing nuts. Make sure all

ionic beds are fastened securely to mounting pins. Position access panel on tank making sure the

gasket is in place and tighten all wing nuts.

Note: Ionic beds not used on DI/RO units.

3. Check and recheck incoming voltage source and control wiring for proper connections and

tightness of connections.

4. Turn on water supply and check for leaks.

5. Make sure access doors and panels are secure.

Enter Password ARMH

Run Mode

Run

(Default)

Test

Contactor Count

1

2

3

4

Control Type
PWM (Default)

On/Off

Power Settings

1000

W

3000

W

5000

W

6650

W

8000

W

EOL Reset

Clear

Ionic

Time

Confirm

Cancel

Failure Record Clear

Clear

Failure

List

Confirm

Cancel


User Password Reset

User

Password

Reset

Confirm

Cancel

Temperature Compensation

Factory Use Only

Water Compensation

Heater Compensation

Advertising
This manual is related to the following products: