Armstrong World Industries 6100 User Manual
Page 16
16
Unit Configuration
Start-Up Procedure (Before “Power On”)
1. Examine the electrical compartment for any loose or disconnected component wiring. Check all
high voltage screw terminal connections at contactor, terminal strip, fuse block & power module for
tightness.
2. Remove Side Panel. Remove tank access panel by unscrewing all wing nuts. Make sure all
ionic beds are fastened securely to mounting pins. Position access panel on tank making sure the
gasket is in place and tighten all wing nuts.
Note: Ionic beds not used on DI/RO units.
3. Check and recheck incoming voltage source and control wiring for proper connections and
tightness of connections.
4. Turn on water supply and check for leaks.
5. Make sure access doors and panels are secure.
Enter Password ARMH
Run Mode
Run
(Default)
Test
Contactor Count
1
2
3
4
Control Type
PWM (Default)
On/Off
Power Settings
1000
W
3000
W
5000
W
6650
W
8000
W
EOL Reset
Clear
Ionic
Time
Confirm
Cancel
Failure Record Clear
Clear
Failure
List
Confirm
Cancel
User Password Reset
User
Password
Reset
Confirm
Cancel
Temperature Compensation
Factory Use Only
Water Compensation
Heater Compensation