Fig. 15, 3 manual 10:1 gearbox ratio option – Hired-Hand RollSeal Rollup Curtains: ROLLUP CURTAIN SYSTEM Rev 11-05 User Manual

Page 23

Advertising
background image

Part No. 4801-5138 Rev 11-05

Rollup Curtain System

Page 23

9.3 Manual 10:1 Gearbox Ratio Option

1. Install right pinion assembly (6419-0100) to rack (0404-4520) as

shown in Fig. 15. Run pinion assembly about half way down rack as
shown.

2. Repeat for left pinion assembly (6419-0104) and rack (0404-4520).

NOTE: Make sure that both pinion assemblies are the same distance
from top of racks.

3. Attach gear pinion sleeve (0404-5647) to the pinion assembly (6419-

0100).

4. Repeat for second pinion assembly. Use 3/8x16x2 HEX screws

(1004-1423) and 3/8x16 lock nuts (1001-1457) to attach pinion
sleeves to pinion assembly.

5. Install Rollup drive assembly to each end of motor/gear box. Fasten

gear pinion sleeves (0404-5144) to each end of motor shaft with
3/8x16x2 screws (1004-1426) and nuts (1001-1457) provided

6. Attach the Rollup Drive Gear Bracket (0404-5645) to the motor with 1/4x20x1 HEX screws (1001-7075).
7. Attach the Rollup Drive Gear Bracket (0404-5142) to the bottoms of the pinion assemblies with

1/4x20x1 HEX screws (1001-7075) and nuts (1001-1446) provided.

8. Go to Section 13 to attach the Rollup Drive Rack Mounts (0404-5141) to the top and bottom of the

racks.

































1001-1446

Lock Nut 1/4x20

1004-1423

Screw 3/8x16x1

1004-7074
Screw 1/4x20x1

1004-1426

Screw 3/8x16x2

1001-1457

Lock Nut 3/8-16

Rack

0404-5645

Gear Bracket

1004-1446

Lock Nut

1/4x20

Rack

1004-7075
Screw
1/4x20x11/2

6419-0370
Gear Box
Assembly

6419-0100
Rollup Pinion
Assembly-Right

6419-0104

Rollup Pinion

Assembly- Left

0404-5647

Pinion Sleeve

Fig. 15

6450-5424 Manual
Drive 10:1
Assembled

4' - 6450-5423
5'.- 6450-5422
10' - 6450-8017

Advertising