End pocket, Fig. 21 end pocket – Hired-Hand RollSeal Rollup Curtains: ROLLUP CURTAIN SYSTEM Rev 11-05 User Manual

Page 29

Advertising
background image

Part No. 4801-5138 Rev 11-05

Rollup Curtain System

Page 29

14. End Pocket

NOTE: C-channel should be cut to length of pocket.

1. Detail A. Fasten C-channel to brackets with sheet metal screws to form C-channel assembly. Repeat for

top C-channel, middle C-channel, and bottom C-channel assemblies. Be sure to use correct bracket. See
NOTE in Fig. 21-below.

2. Detail B. Position top C-channel assembly as shown. Attach C-channel assembly to top stinger with sheet

metal screws.

3. Detail C. Position middle C-channel assembly as shown. Attach C-channel assembly to middle stringer

with sheet metal screws.

4. Detail D. Position bottom C-channel assembly as shown. Attach bottom C-channel assembly to concrete

foundation with Tapcon screws.

5. Detail E. Attach cap to each end of system as shown. Attach panels to C-channels with sheet metal

screws.







































DETAIL E

TOP VIEW

End cap

End cap

This end cap encloses

end of pocket.

DETAIL A

DETAIL B

DETAIL C

DETAIL D

Bracket

8" C-channel

(not supplied)

Metal panel

Sheet metal

screw

4.0"

(10.2 cm)

4.0"

(10.3 cm)

4.0"

(10.3 cm)

Sheet metal

screw

Concrete

8" C-channel
(not supplied)

8" C-channel
(not supplied)

8" C-channel

(not supplied)

FIG. 21

End Pocket

Tapcon screw

NOTE:
C-channel
Should Be Cut
To Length Of
Pocket. 3 Ft.
(91 cm) Is
Recommended.

NOTE: The Drive
pocket bracket
extends outward
farther than the
End pocket
bracket. Make sure
to use correct
bracket.
NOTE: End pocket
bracket extends 3"
(8.9 cm).

Advertising