Extractive installation – COSA Xentaur Xentaur XDTL-HT User Manual

Page 11

Advertising
background image

Installation

11

Extractive Installation

Enclosure

1

6

4

8

9

Calibration

Gas Inlet

Process

Gas Inlet

Sample

Gas

Exhaust

7

pipeline

Pipe Nipple

Thredolet

Ball Valve

Baseplate

Housing

Regulator

Relief Valve

Ball Valve

Outlet Connector

Pressure Gauge

Notes:

Enclosure insulated on all sides to
maintain nomially 34°C ± 1°C in a
temperature range of -20°C to 50°C.
Inlet rated to 6000 psig maximum.
Flow rate is 2 l/min nominal.
All ¼” Swaglok fittings and tubing.

Shop Air

Inlet

Shop Air

Inlet

Sample

Gas

Exhaust

5

5

2

2

10

1. Back pressure regulator

5. Adjustable regulator

9. Pressure gauge (0-30 psig)

2. Eductor

6. 3-way valve

10. Gas sampling filter

3. All ¼” stainless steel tubing

7. XTDL-HT™ laser cell

4. Flow meter

8. Enclosure heater


The instrument should be installed in a slip stream of process gas. Please make sure that:

 The sample is taken from the upper surface of the main gas line to avoid problem of

contamination.

 The sample is taken away from the pipe wall where flow rates may be low, and dewpoint change

may lag.

 If regulators or shut-off valves are used up stream of the instrument, make sure that these do not

contain rubber or other hygroscopic materials.

 Stainless steel tubing is preferred. Copper tubing is acceptable. Do not use plastic, rubber, or

Tygon tubing due to water retention in these materials.

 Use small diameter pipes (1/4” or 1/8” OD).
 Do not install other devices up stream of the instrument, such as other measurement systems,

which are not absolutely necessary as these are potential leak sources.

Advertising