KYORITSU 3127 User Manual

Page 33

Advertising
background image

- 30 -

6-8 Ramp Measurement
Voltage used in Step voltage test is raised in steps but that used in Ramp
measurement is gradually raised. Therefore, Ramp measurement is useful to fi nd
the points of insulation failure without causing serious damages. This enables
you to locate a fault, such as pinholes in windings, by seeing a spark or a wisp of
smoke.
KEW3127 displays the breakdown voltage value when insulation breakdown
occurs in load.

* Breakdown mode
When a breakdown occurs, KEW3127 stops measurement and displays the
voltage which caused breakdown. When no breakdown is detected, voltage is
raised till it reaches to the preset voltage value.

* Burn mode
KEW3127 continues measurement, even if a breakdown is detected, until applying
voltage reaches to the preset value. Breakdown voltage will be displayed after a
measurement.

Note: Ensure that the object under test is completely discharged before performing
a Ramp measurement.

Resistance value

End of test:

Output current

Breakdown voltage

(Voltage value when breakdown

occurred.)

Time when

a test ends

Output voltage

Ramp measurement result

Breakdown mark

(Either following marks

blinks when breakdown

occurs.)

: Burn mode is set

Breakdown mode is set.

Advertising