2hints on operation 2.1 – West Control Solutions KS 800 Profibus Interface Manual User Manual

Page 7

Advertising
background image

2

Hints on operation

2.1

Interface connection

The PROFIBUS must be connected to the 9-pole sub-D socket.

Serial interface, physical RS485-based signals.

The construction of suitable cabling must be provided by the user, whereby the general cable specifications

to EN 50170 vol.2 must be taken into account.

2.1.1

Installation of cables

When laying the cables, the general hints for cable installation given by the supplier of the master module

must be followed:

w

Cable run in buildings (inside and outside cabinets)

w

Cable run inside and outside buildings

w

Potential compensation

w

Cable screening

w

Measures against interference voltages

w

Stub line length

w

Bus termination resistors are not contained in KS800-DP, but must be realized via the connector, if

necessary.

w

Earthing

g

Special hints for installation of PROFIBUS cables are given in the PNO technical guideline “Installation

guidelines for PROFIBUS-DP/FMS” (Order no. 2.111 [dt]; 2.112 [engl.]).

2.2

Forcing

Digital outputs can be written directly after configuring them accordingly.

Hints on operation

7

9499 040 50511

Fig.: 1 Connecting PROFIBUS-DP

do

C.100 C.500

/

Advertising