Gas Supply Pipe Sizing and Looping

Figure 13

TMB2126N

1

Gas Furnace (120,000 Btu/hr)

8

25 ft. (7.6 m)

2

Gas Water Heaters (400,000 Btu/hr each)

9

Main Regulator

3

Gas Space Heaters (70,000 Btu/hr each)

10

Gas Meter

4

Sediment Traps, Supply Pressure Taps and

11

Pressure Regulator (If required)

Shut-Off Valves. Refer to Figure 12.

12

25 Pound Tumblers (64,000 Btu/hr each)

5

1 in. (25.4 mm) Pipe for Gas Loop

30 Pound Tumblers (73,000 Btu/hr each)

6

19 ft. (5.8 m)

T30 Tumblers (73,000 Btu/hr each)

7

Minimum pipe size to tumbler is 0.5 in. (12.7 mm).

35 Pound Tumblers (90,000 Btu/hr each)

SAMPLE CALCULATIONS:

Equivalent length = Total length of main gas supply pipe to the far end of the tumblers.

= 25 ft. + 19 ft. (7.6 m + 5.8 m) gas supply pipe
= 44 ft

.

(13.4 m) Total Gas Line

Total Btu/hr

= The sum of the Btu/hr of all 30 pound tumblers being fed by the main gas supply pipe.
= 9 x 73,000
= 657,000 Btu/hr

Using Table 6, the main supply pipe diameter should be 2 in. (51 mm).

IMPORTANT: Gas pipe loop must be installed as illustrated to equalize gas pressure for all tumblers
connected to single gas service. Other gas using appliances should be connected upstream from loop.

1

2

3

4

5

6

7

8

9

M

9

12

8

6

3

2

1

10

11

7

4

5

Advertising