Ferrite ring installation – Alliance Laundry Systems 70269701R4 User Manual

Page 53

Advertising
background image

Electrical Requirements

51

70269701

© Copyright, Alliance Laundry Systems LLC – DO NOT COPY or TRANSMIT

Ferrite Ring Installation

Gas and Steam OPL Micro Control Models Only

The ferrite ring provided in the literature packet must
be installed over the power leads during connection of
electrical service. The ferrite protects the sensitive
electronic controls from destructive electrical
disturbances which may be present on power lines to
the machine. Failure to properly install the ferrite ring
may result in damage to the electronic controls and
will void control warranty.

To Install:

1. Immediately after connection of power leads and

before applying power to machine, locate each of
the incoming service leads including ground.

2. Snap the ferrite ring closed over all of the service

leads inside of the control tray as shown. It is
important that the ferrite ring be installed inside
the control tray. Refer to Figure 14. Do not install
the ferrite outside of the box or other area. Make
sure that service leads are in the center of the
ferrite before closing the ring so as not to pinch
or damage leads.

Figure 14

T383I

1

Ferrite Ring

2

Electrical Connections V.A.C.~

3

Ground Wire

1

2

3

}

Advertising