Chapter 3 - getting started, Introduction 3-1, Power on procedure 3-1 – Anritsu S251C User Manual

Page 38: Introduction -1 power on procedure -1, Chapter 3 getting started, Introduction, Power on procedure, On/off key figure 3-1. site master on/off key

Advertising
background image

Chapter 3
Getting Started

Introduction

This chapter provides a brief overview of the Anritsu Site Master. The intent of this chapter
is to provide the user with a starting point for making basic measurements.

Power On Procedure

The Anritsu Site Master is capable of up to 2.5 hours of continuous operation from a fully
charged, field-replaceable battery. Built-in energy conservation features allow battery life to
be extended over an eight-hour workday.

The Site Master can also be operated from a 12.5 Vdc source (which will also simulta-
neously charge the battery). This can be achieved with either the Anritsu AC-DC Adapter
(P/N 40-115) or 12.5 Vdc Automotive Cigarette Lighter Adapter (P/N 806-62). Both items
are included as standard accessories (see Chapter 1).

To power on the Site Master:

Step 1. Press the

ON/OFF front panel key (Figure 3-1).

The screen displays the Anritsu logo, the Site Master model number, and the
firmware version. The Site Master then takes about five seconds to perform a se-
ries of self-diagnostic and adjustment routines, then displays:

Step 2. Press

ENTER to continue.

If ENTER is not pressed, the Site Master will continue after a 10 second time-
out. The Site Master is now ready for operation.

3-1

3

HOLD

RUN

START
CAL

AUTO
SCALE

SAVE
SETUP

RECALL
SETUP

LIMIT

MARKER

SAVE
DISPLAY

RECALL
DISPLAY

PRINT

MODE

FREQ/DIST

AMPLITUDE

SWEEP

SYS

ENTER

CLEAR

ESCAPE

ON

OFF

/

1

2

4

5

6

7

8

9

0

3

+

-

.

Site Master S251C

ON/OFF

KEY

Figure 3-1.

Site Master On/Off Key

Advertising